AlexanderBetrouwbare leveranciers -
LouisHet was een genoegen om met je te werken.
High Pressure Boiler Economizer Heat Exchanger with 3 Years Warranty and 1-20 Ton Capacity
Neem contact met me op voor gratis monsters en coupons.
WhatsApp:0086 18588475571
WeChat: 0086 18588475571
skypen: sales10@aixton.com
Als u zich zorgen maakt, bieden we 24-uurs online hulp.
x| Type | Natuurlijke Omloop | Gebruik | Energiecentrale |
|---|---|---|---|
| Structuur | waterbuis | Druk | Hoge druk |
| Stoomproductie | Max. 20 t/h | Stijl | horizontaal |
| Uitvoer | Warm water | Ontwerpbrandstof | Kolenbrandstof |
| Materiaal | Speciale ketel staalplaat | Brandstoftype | Cola ovengas |
| Gewicht | 1-20 ton | Smelteproces | EF+LF + VD |
| UT norm | ASTM A388 of EN10228 | Materiële standaard | ASTM, en of ISO |
| Proces | Materiaal-> ingot -> warm/cold -rolling-> warmtebehandeling (normaliseren+ temperen) -> | ||
| Markeren | High Pressure Boiler Economizer,3 Years Warranty Heat Exchanger,1-20 Ton Boiler Economizer |
||
Boiler economizers are heat exchange devices with finned tubes that heat liquids (typically water) to temperatures below their boiling point. We manufacture three types of boiler economizers:
- Bare tube economizer
- H-finned tube economizer
- Spiral finned tube economizer
The H-finned tube economizer is a highly efficient heat exchanger consisting of H-finned tubes. Compared to bare tube economizers, it offers:
- Expanded heat exchange area
- Reduced number of required tubes
- Increased flue gas flow area
- Reduced flue gas flow speed and abrasion
Our H-finned tubes can be manufactured as double H-finned tubes with high rigidity to accommodate long tube rows. The spiral finned economizer is our innovative design featuring spiral fin tubes to overcome abrasion issues and extend service life.
| Description | Boiler economizer |
|---|---|
| Material | Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
| Material standard | ASTM, EN or ISO etc. |
| Dimension | Customization |
| Weight | Min: 10 ton Max: 1000 ton |
| Smelting Process | EF+LF+VD |
| Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment (Normalizing+ tempering)→Inspection→rough machining→UT→2nd Heat treatment→finishing machining→Inspection |
| UT standard | ASTM A388 or EN10228, etc. |
- Impact test and Strength calculation report with applied materials information
- 100% NDT (non-destructive inspection) report of steel plate, tube and electrode
- X-ray, γ-ray and liquid penetrant test inspection report (welding seam) to ensure boiler quality
- Hydraulic test report to verify standard working pressure and safety
Address: No.1 Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Tel: +86 (0) 512 5866 6196
Fax: +86(0) 512 5877 4453
Web: www.boilerfabrication.com